Appin Area 9 Development Project

Project Appin Area 9 Development Project
Location Wollongong, NSW
Client South32 Illawarra Coal (previously BHP Billiton)
Partnership Since 2013
Finish Date 2015
Project Description:

The South32 Bulli Seam Operations includes the combined mining operations of Appin and West Cliff mines.

The Appin Area 9 Development project consisted of driving the travel and conveyor roadway from West Cliff to Appin West (life of mine roadways). Reclaiming gas drainage pipes, reticulation cables, redundant service pipes and rib/roof support to allow the life-of-mine belt system to be installed in the same roadway. A trunk conveyor system was built for around 3km, and then extended as production continued to around 7km.

Driveage included the travel road from 14-36ct, and the travel and belt roads from 36-51ct (holing point into Appin West).

Appin Area 9 Project was to reclaim already driven roadways in 516 panel. A large water management stub was also driven off 36ct to capture any overflow water in a power loss event.

The project was completed 4 months ahead of schedule saving South32 in excess of $2 million.

Mastermyne

Metarock (ASX: MYE) is a leading Australian mining services group providing a diverse range of services and products to underground operations across the country.

©Metarock Group Limited
All Rights Reserved.
ABN: 96 142 490 579

P: (07) 4963 0400
E: master@mastermyne.com.au
A: Level 1 Riverside Plaza
45 River Street, Mackay QLD 4740

©Mastermyne Pty. Ltd.
ABN 71 069 346 247
Privacy Terms of use

Designed by redhotblue