A METAROCK GROUP LIMITED BUSINESS

Ulan West Mine

Project Ulan West Mine
Location Mudgee, NSW
Client Glencore
Partnership Since 2014
Finish Date Ongoing
Project Description:

Contracted to deliver ventilation and outbye services, Mastermyne have been operating at Ulan West since first coal production in 2014. Specialising in Ventilation and VCD solutions we work closely with Ulan West from design and supply right through to final installation. Mastermyne are the preferred VCD Installation Contractor for the site.

Mastermyne

Metarock (ASX: MYE) is a leading Australian mining services group providing a diverse range of services and products to underground operations across the country.

©Metarock Group Limited
All Rights Reserved.
ABN: 96 142 490 579

P: (07) 4963 0400
E: master@mastermyne.com.au
A: Level 1 Riverside Plaza
45 River Street, Mackay QLD 4740

©Mastermyne Pty. Ltd.
ABN 71 069 346 247
Privacy Terms of use

Designed by redhotblue